Having traversed the desolate border between Kazakhstan and Lucia, even before the disaster, Chen Xin and his team arrived at the train station on the Lucia border as planned.
However, as they had anticipated, they encountered the issue of switching tracks. Moreover, the so-called station had long been buried under snow. To complete the track switch, they not only had to clear the snow from two different gauge tracks but also dig out the crane used for switching, the warehouse with broad-gauge wheels, and the platform from under the snow.
Fortunately, for Chen Xin, this was not a problem. He instructed the soldiers accompanying him to help clear the two tracks and, after finding the broad-gauge wheels, had them temporarily set up a gate between the two tracks with an engineering vehicle.
Then Chen Xin had their train pass through the gate onto the broad-gauge track and upgraded their train with the broad-gauge wheels found by the soldiers.
