LightReader

Chapter 462 - Chapter 460: Demolition Mission

Below the fissure beside the settlement point, several Titans are drilling grooves along one side of the fissure for placing support steel beams.

Due to the need to demolish the surrounding building debris with explosives, in order to prevent affecting the structural stability of the current settlement site's location, it must be reinforced.

The reinforcement method is also simple, building a frame with steel beams to secure the platform formed by the snow under the settlement, and filling the frame with a mixture of rubble and snow blocks, then pouring water over it to freeze it completely.

In this way, the foundation of the settlement point can be secured, becoming solid and stable.

This is not a new idea, merely an old trick used more than two thousand years ago by Prime Minister Cao during his campaign against Xiliang, building with water.

This is the end of Part One, download Chereads app to continue:
More Chapters