LightReader

Chapter 663 - Chapter 561: Resuming Production

The enthusiasm exhibited by the mobilized populace is astonishing.

Many have voluntarily provided assistance for construction and material transportation, significantly accelerating the pace of construction.

Within 48 hours, the steel-framed factory buildings were erected in the factory district originally designated within Dome City.

Meanwhile, after Chen Xin dispatched personnel, the military collaborated with the technical staff to dismantle the Titan production equipment, packing and transporting it to Dome City, where it is currently being installed and configured urgently.

Additionally, the previously emphasized train station by Chen Xin has been rapidly laid with two temporary tracks, allowing materials gathered from other locations to be transported continuously into Dome City.

Though Titan production previously took place at the Research Center, not all components were produced there.

This is the end of Part One, download Chereads app to continue:
More Chapters