LightReader

Chapter 1109 - 2.26 million kilometre super basin (XXL)

4th of February 1693

Simhasan Bhavana

Vijay had packed up for a long journey, but before he set off, he wanted to understand how the construction of the Metro line was going. He called Ganesh and asked him.

Ganesh, remembering the data from the back of his mind, replied, "So far, around 50 pillars have been erected, your majesty, and 700 metres of platform have already been installed."

"Hmm!" Vijay contemplated the data as he leaned back. The total length of the metro line is over 114 km, built with 3800 pillars and several underground tunnels in areas of high elevation. At the rate it is going now, the entire project will be completed in 4.4 years.

This is the end of Part One, download Chereads app to continue:
More Chapters