In three or four days, plus the previous few days, the construction speed of the Daoist temple has actually been very fast.
A temple with a floor area of over 400 square meters can be built in a week. The Li Family Construction Group lives up to its reputation.
"The speed is quite fast," Chen Yang remarked with a smile.
The manager initially worried that Chen Yang might think this speed was a bit slow, but he didn't expect such a comment.
"Mr. Chen, we'll try to speed up as much as possible, while ensuring the quality, of course," the project manager said with a smile.
"Hmm, good."
After understanding the situation of the project, Chen Yang didn't stay much longer. After responding with a hum, he left the site and returned to the village.
By the time he returned to the village, it was already late, and the sun was beginning to set.
