LightReader

Chapter 409 - The Smoothest of Operations

The equipment President Santos had arranged arrived within two hours, transforming what had initially seemed like an impossible undertaking into something that felt surprisingly manageable. Heavy earth-moving machinery, precision digging tools, irrigation equipment, and specialized soil amendment supplies were unloaded by a crew of local workers who seemed genuinely excited to be part of what they clearly recognized as a significant environmental restoration project.

What made the entire operation work, though, was the way my constructions worker skills allowed me to coordinate everything with a level of efficiency that surprised even me. Integrated Team Leadership was providing real-time analysis of worker capabilities, equipment status, and optimal task allocation, while Decentralized Coordination allowed me to manage multiple simultaneous operations without creating bottlenecks or confusion. 

This is the end of Part One, download Chereads app to continue:
More Chapters