LightReader

Chapter 846 - Chapter 75: The Details in Construction

Although the type of Floating City module has been changed and the entire construction plan needs major revisions, overall, there aren't many things that actually need to be altered.

The Floating City modules that have already been built don't require major changes; just some adjustments to the details can accommodate the updated drawings by Perfikot.

As for the parts under construction, Perfikot also made targeted adjustments, so there aren't many areas that need to be redone.

The real significant change is in the design drawings themselves.

This part Perfikot has already sorted out on her own, so overall, it's not a big problem.

This situation reminds Perfikot of when she hadn't yet traveled here; she once received such an outrageous order where the client wanted to change the drawings after the construction was already a third underway, a complete revision with a change in the overall usage.

This is the end of Part One, download Chereads app to continue:
More Chapters