LightReader

Chapter 667 - Chapter 215: Plotting for Taiping Continent

"What the hell, this water plant is insanely large."

Wildman stood on the mountain peak and looked down. Tanks, water pipes, filtration systems, aeration, and purification pools... stretched endlessly. The neatly arranged water purification facilities gave off a sense of comfort.

According to the construction plans, the entire complex covered an area of 120 hectares. It purified 1.9 million tons of water daily, with 500,000 tons processed for drinking after secondary treatment, while the remaining 1.4 million tons could be used as industrial and domestic water. Without considering backup power, the plant could self-sustain all its electricity needs through a Shiva electrolytic cell and incineration power generation, with even some surplus.

This is the end of Part One, download Chereads app to continue:
More Chapters