March 20th, 2028 — Subic Bay Freeport Zone
TG Motors EV Gigafactory – Main Assembly Hall
The factory floor moved like a machine with a heartbeat.
Robotic arms slid battery packs into chassis with mechanical precision. Overhead conveyors carried painted bodies in a slow, continuous river of metal. Forklifts glided across marked lanes, hauling pallets of components. Human workers watched screens, checked torque specs, signed off on QC sheets.
From the catwalk above, Timothy watched it all.
Subic had started as an ambitious idea on paper. Now it was a continent of steel and concrete dedicated to his vision—hundreds of thousands of square meters of manufacturing, stamping, painting, module assembly, LithiumX integration.
"Line Three is hitting 96% uptime over the last seven days," Hana said beside him, reading from her tablet. "Defects per thousand units are down twelve percent since we installed the new vision systems."
