LightReader

Chapter 166 - Getting Closer

May 12th, 2028

Malacañang Policy Transition Hall – Industry Cluster Consultation

2:18 PM

The hall looked different this time.

Not like a formal council chamber.

Not like a press briefing room.

It looked like an organized workspace.

Foldable screens on the walls showing agency charts.

Tables arranged in clusters — not VIP rows.

Coffee dispensers in the back, stacks of policy printouts sitting on long tables, labeled:

ENERGY — INFRASTRUCTURE — FOREIGN DIRECT INVESTMENT — REGULATORY FRAMEWORK

Timothy arrived with his folder tucked under his arm. No media coverage, no cameras. Just PSG officers directing people to their assigned tables.

His nameplate was already there:

PRIVATE SECTOR – HEAVY INDUSTRY / ENERGY INFRASTRUCTURE

He sat beside representatives from San Miguel Global Holdings, Meralco Industrial, Bank of the Philippines Maxima, and an engineering consortium from Mindanao. Across the room were seats marked:

This is the end of Part One, download Chereads app to continue:
More Chapters