Under the efforts of Cao Daren and the workers, the pipeline connecting the two heating hubs was finally completed. Although they encountered some troubles during construction, they quickly resolved these issues, allowing the pipeline to be successfully completed in a short time.
A considerable part of the credit also goes to Lin City Hall. To quickly establish the heating hubs, Lin City Hall invested a significant amount of manpower and resources into the project.
They not only provided ample manpower support but also sent all the construction equipment that could be gathered in the city to the construction site.
With several construction points advancing simultaneously, this allowed the entire pipeline to be completed faster than expected.
After construction was completed, the two heating hubs were finally able to operate at full power without any hindrance, and the heating field could be fully expanded.